1. Responsible for the operation, inspection, maintenance of the belt, do a good job of inspection records, strictly monitor the belt, and closely contact with
1. Do a good job in the trial operation of various equipment before pouring, feed back the problems in time and cooperate with them until they pass the
1.Responsible for the installation, commissioning, technical transformation, repair and maintenance of high and low voltage distribution circuits and
1. Responsible for the installation, repair and maintenance of high and low voltage lines, motors and electrical equipment 2. Responsible for the maintenance
1. Responsible for sampling and sample making of raw materials and auxiliary materials, semi-finished products and finished products in the production process;
1. Responsible for the recovery of gas, the opening and closing of all valves and equipment such as starting and stopping pressure machine and electric dust
1. Be responsible for the maintenance of materials and equipment lifted by the crane of the team. 2. Organize employees to conduct on-the-job business
1. Through the vibrating screen operation, the material is screened to ensure that the screened lump ore is free of powder and meets the requirements of blast
1.Responsible for the daily routine work of labority team. 2. Test iron ore, coal coke and other raw materials strictly in accordance with cnas-cl01 standards
1. Responsible for the operation of the packing machine in the finishing area of the factory, and bundling the finished products according to the production
1. Responsible for tundish repair, material preparation and lifting, and cooperate with continuous casting maintenance. 2. Responsible for the down line, up
1. Responsible for spot inspection and maintenance of rod mill and associated equipment, analysis, judgment and solution of equipment faults. 2. Operate
1. Responsible for the normal operation of all belts in the magnetic separation production line to prevent belt deviation, foreign matters scratching the belt,
*This vacancy open for Pellet Workshop and Conveyor Belt Project. *Pellet workshop estimated will start operate on December 2020. *Conveyor belt project
a) Carry out the daily preventive maintenance and checking on the Moulding Machines, Air Compressors and Pre-Expander according to the procedures and using the
Remote and on-site analysis and troubleshooting - Provide guidance/ advise/ support to applicant level technical support team - Conduct technical and operation
Air Con Maintenance & Repair- Air Con InstallationNEW SAN YU AIR COND & ELECTRICAL SERVICEwas established in Penang on 1991 Since itsinception, it has gained a
1) Technicians perform electrical or mechanical troubleshooting to determine problems in non-functioning electro-mechanical equipment used in the manufacturing
1. Be responsible for the organization and implementation of daily maintenance, repair and maintenance of vehicles, as well as the storage, maintenance and use
1. Do a good job in the trial operation of various equipment before pouring, feed back the problems in time and cooperate with them until they pass the