To troubleshoot any problems with the hardware used for production.- Support production during change model and set up the correct fixtures / equipment for
Support SMT production lines assuring the proper functioning and setup of the equipment.- Support on Introduction of New Product (NPI) programs for the Screen
**Summary**Be responsible for plant level cost and control including the general accounting, cost accounting, bill of material audit, inventory reconciliation
Summary Be responsible for plant level cost and control including the general accounting, cost accounting, bill of material audit, inventory reconciliation and
Review ATC ordering and work out 3 months production schedule planning to production in weekly and monthly requirements- Work out weekly and monthly AI/MI/FA
BIM MODELER (M&E)Production of drawings on CAD and BIM Revit model for M&E/C&S works- Working towards deadlines set by Project Manager or CAD/BIM Manager-
**Summary**:**Salary**:CompetitiveTeam:Project and Programme Management**Location**:Global Development Campus, Johor Bahru**About us**:**About the role**:-
1 Set up procedure (New Project Testing Follow Engineering S.O.P ) a) Follow PLANNER schedule to set up. b) Getting information to change mold. (Daily follow
**Please do not contact at the number ends with 7227 you get from Google as it is a wrong number. Thank you.****34187TG A(CM-35) Purchaser x 2 ( Mechanical and
Purchaser x 2 ( Mechanical and Electrical)Salary : Up to RM 3,000Allowance: RM 200( Transport Fee)Working Hours : 9am - 6pm (Mon - Fri)Working Location : SILC
Purchaser x 2 ( Mechanical and Electrical)Salary : Up to RM 3,000Allowance: RM 200( Transport Fee)Working Hours : 9am - 6pm (Mon - Fri)Working Location : SILC
Responsible for the overall function of molding department - Ensure all machinery, equipment, mold, facilities etc are properly maintained - Responsible for
Job Role:- Responsible for equipment layout,piping arrangement and ISO drawing according to PID etc.- Responsible for Piping Material Specification (PMS) and
**JOB DESCRIPTION**1. To perform maintenance of all equipment - Cleaning workstations and equipment before and after production runs to ensure that the
**About the Role**:**Project Coordinator****Full-Time, Permanent****Johor****About the Company**James Fisher Decommissioning, Part of the James Fisher Energy
**Responsibilities**:- Have a good knowledge & familiar with M&E Design and manage to interpret 2D MEP Drawings to 3D BIM Model;- Do have experience creating /
Plan, co-ordinate and monitor the receipt, storage and dispatch of goods.- Organize, facilitate and manage stock takes at regular intervals.- Deliver the
**Job Description**:- Plan, co-ordinate and monitor the receipt, storage and dispatch of goods.- Organize, facilitate and manage stock takes at regular
**Primary job function**- Develop, maintain and optimize program for AOI machines- Setup machine program, equipment installation, repair, maintenance and
1. Responsible to manage Company vehicles inclusive of utilization plan, movement, maintenance, insurance, petrol usage, fleet card, road tax, etc. 2. Manage