1. Assist the sintering foreman on duty in organizing and directing the batch production of the class, be responsible for the technical operation of the
1. Be responsible for formulating the spare parts plan of the coking plant, establishing a reasonable spare parts inventory, guiding the warehouse personnel to
1.Assist the manager of production control in production especially converter workshop. Organize the production of the converter, and work hard to fully
1. After the steel is out of the converter, the ladle is filled with molten steel. The temperature of molten steel is up to more than 1600 degrees, and the
1.BPRT equipment and water pump are the core auxiliary equipment of iron making. Responsible for the operation and technical guidance for the water pump
1. Assist the shift leader in charge of the coal loading operation and furnace top area management of the shift. 2. Strictly implement the safety regulations
1. Responsible for the inspection, switch, shutdown, maintenance and emergency stop accident handling of the main exhaust fan. Responsible for close contact
1. Responsible for selecting the corresponding cooling control process according to the rolled specifications and varieties, sorting out the coil head and tail
1.Responsible for reasonable arrangement and stacking of materials. 2.Responsible to verify and accept the quality and quantity of raw fuel. 3.Be responsible
1. According to the production close the fan ban,open the rising pipe cover ,and open the coal charging hole cover to dry the furnace. 2.Open the high pressure
1. The work unit focuses on the slag free treatment of steel-making, with a daily production capacity of about 1500 tons, frequent reshipment and heavy
1.Perform daily maintenance and safety checks of equipment. 2.Preparing and positioning plant for operation on site. 3.Operate the machine and other heavy
PTS Goldkist Industries SDN BHD commenced operation in the year 1983. It is located at the prime location of Gebeng Industrial Estate, Kuantan, near the deep
1. Implement the various tasks assigned by the steelmaking plant, and do a good job in the management of the workshop. 2. Responsible for organizing employees
1. Accurately calculate the proportion of ingredients, accurately adjust the moisture content, so that each raw material reaches the given index. 2. Be
1.Have good knowledge about the production process of this position, equipment operation procedures and safe production. 2.Complete equipment inspection,
1.Responsible for the end point and behind furnace sampling, sample delivery, and sample report work. 2.Responsible for the temperature measurement at the end
1. Complete the coke pushing, coal leveling and production plan of the shift, and convey the production instructions issued by the working section. 2. Clean
1. Be responsible for the coke blocking production operation of the shift, obey the shift leader's management, and cooperate to complete the production
1. Responsible for inspection and maintenance of electric precipitators and induced draft fans, electric dust removal and ash discharge work, and found