1. After the steel is out of the converter, the ladle is filled with molten steel. The temperature of molten steel is up to more than 1600 degrees, and the
1. Responsible for spot inspection and maintenance of rod mill and associated equipment, analysis, judgment and solution of equipment faults; 2. Operate
1, responsible for organizing the sintering section materials, personnel, equipment, technology and other elements, to complete the task of production; 2,
1) be responsible for normal monitoring (temperature, pressure, displacement, etc.) and switching, stopping and replacing of major equipment such as washing
*This vacancy open for Pellet Workshop and Conveyor Belt Project. *Pellet workshop estimated will start operate on December 2020. *Conveyor belt project
1. Stick to the post to ensure the water supply. 2. Responsible for the primary and secondary maintenance of water pump and equipment, valves and pipelines in
1.Responsible for carry out daily dedusting and cleaning work at the high-risk working place safely and effectively. 2.The bag replacement inside the box area
1. Do a good job in the trial operation of various equipment before pouring, feed back the problems in time and cooperate with them until they pass the
1.Responsible for rolling mill equipment operation, according to the rolling procedure requirements and process parameters, rough rolling control and
1. Be fully responsible for the management of receiving raw materials to the coal bunker, and take direct responsibility for the mixed coal bunker or the wrong
1. Be responsible for the organization and implementation of daily maintenance, repair and maintenance of vehicles, as well as the storage, maintenance and use
1. Make preparations before pouring and prepare various tools required for the post. 2. Do a good job in the trial operation of various equipment (including
FRONT TECH ENGINEERING SDN BHD is a local company formed in 2006 based in Kemaman, Terengganu. This company is involved mainly with new electrical,
1. Responsible for balancing and coordinating the production operations of all units, timely transmitting, feedback, and analyzing important information in
1. Be responsible for checking and confirming the equipment before starting the pre-finish mill. 2. Engage in commissioning of the pre-finish mill, adjustment
Require Certificate/Diploma in Electrical/Air conditioning;- Responsible to perform repair and maintenance, troubleshooting, regular inspection ;- Install,
1.Responsible for checking the working condition of the bag to ensure that the gas dust content is 5mg/m3. 2.Responsible for adjusting the gas release pressure
*This vacancy open for Pellet Workshop and Conveyor Belt Project. *Pellet workshop estimated will start operate on December 2020. *Conveyor belt project
1. Responsible for the operation, inspection, maintenance of the belt, do a good job of inspection records, strictly monitor the belt, and closely contact with
1. Be responsible for timely and accurate weighing of alloy materials, and participate in terminal sampling, temperature measurement, argon blowing operation