1.Responsible for checking and distinguishing the type of material in the truck that enters and exits (whether contain water) and material quality.
1.Responsible for organizing worker to heat the stove and provide the required wind temperature for the blast furnace, to create the optimum conditions to
1. Be responsible for timely and accurate weighing of alloy materials, and participate in terminal sampling, temperature measurement, argon blowing operation
1. Responsible for the normal operation of all belts in the magnetic separation production line to prevent belt deviation, foreign matters scratching the belt,
1. Have to understand function of dust production equipment, familliar with dust prodution equipment operation, ensure dust production runs smoothly and normal
1. Responsible for the implementation of milling standards, according to the grinding standards of the roller ring grinding, to achieve drawings, templates,
*This vacancy open for Pellet Workshop and Conveyor Belt Project. *Pellet workshop estimated will start operate on December 2020. *Conveyor belt project
1.Responsible for checking the working condition of the bag to ensure that the gas dust content is 5mg/m3. 2.Responsible for adjusting the gas release pressure
1. Be responsible for the maintenance of materials and equipment lifted by the crane of the team. 2. Organize employees to conduct on-the-job business
1. Obey superior leaders, check and confirm and prepare necessary tools and materials for production (hydraulic cylinder, hydraulic tubing, large and medium
1. Be responsible for the organization and implementation of daily maintenance, repair and maintenance of vehicles, as well as the storage, maintenance and use
1. Responsible for the assembly and on-line installation of the roller box. strictly implement the technical requirements for the assembly of the roller box,
1.BPRT equipment and water pump are the core auxiliary equipment of iron making. Responsible for the operation management and technical guidance to handle
1. Responsible for the low-level pickling test of the whole class billet; the sample processing and wire-related processing of the wire, threaded bar and
*This vacancy open for Pellet Workshop and Conveyor Belt Project. *Pellet workshop estimated will start operate on December 2020. *Conveyor belt project
1. Responsible for the assembly and on-line installation of the roller box. strictly implement the technical requirements for the assembly of the roller box,
1. Responsible for the handling of gas operation and process accident handling. 2. Check the furnace operation, check the lime roasting situation. 3. Handling
1. Under the leadership of the dispatching Control Senior Manager, according to the operation of the equipment in each capacity and energy-using department,
1. Do a good job in the trial operation of various equipment before pouring, feed back the problems in time and cooperate with them until they pass the
1. Understand the production status and production pace, responsible for communication with other department, to ensure smooth production, and give feedback on