1. Responsible for the unpacking, acceptance and distribution of goods in and out from the warehouse, arrange the spare parts on the shelves, and adding
1. Adjust each index according to the control index issued by the temperature measuring worker or the flame adjusting worker, and conduct regular inspection on
1. Responsible for lifting, unloading and loading scrap, and providing stable scrap supply for steelmaking production. 2. Regularly maintain the vehicle,
1. Accept the instructions and instructions of the squad leader, implement various standards such as driving inspection standards and operating standards, and
1.Responsible for checking the operational status of the equipment, lubricate and tighten when neede, to ensure the safe operation of the equipment.
1. Obey the shift leader's management to complete the planned task on duty. 2. Carefully implement the safety operation procedures of the post, complete the
1) Follow up the sludge pressure in the sedimentation tank to ensure the effluent turbidity is qualified. 2) Be responsible for the preparation of chemicals.
1.Responsible for checking and distinguishing the type of material in the truck that enters and exits (whether contain water) and material quality.
1. Be responsible for timely and accurate weighing of alloy materials, and participate in terminal sampling, temperature measurement, argon blowing operation
1. Responsible for the normal operation of all belts in the magnetic separation production line to prevent belt deviation, foreign matters scratching the belt,
1. Assist the substation accident and abnormal treatment, on-site Switching operation, work ticket processing (final, acceptance), regular cutting (round)
1. Responsible for the supervision and review of valid inbound and outbound data in metal materials. 2. Familiar with the performance of metal materials and
"1. Responsible for daily routine work of the office, printing and sending various documents, and receiving documents and materials of the company. 2.
1. Confirm the production plan according to the contract and order, make and arrange the product label 2. Tracked the production progress of sales orders with
*This vacancy open for Pellet Workshop and Conveyor Belt Project. *Pellet workshop estimated will start operate on December 2020. *Conveyor belt project
1. Obey superior leaders, check and confirm and prepare necessary tools and materials for production (hydraulic cylinder, hydraulic tubing, large and medium
1. Responsible for the assembly and on-line installation of the roller box. strictly implement the technical requirements for the assembly of the roller box,
1. Record inventory sparepart every month. 2. Make sure the cleaniness of the store. 3. Make purchasing spare part on system. 4. Resolve matters regarding
1. Responsible for the execution of pass drawing and turning standards, processing of various types, making sure that the drawing, sample and pass conform to
1. Familiar with and master the operating procedures and safety operating procedures of this post and implement them carefully. 2. Assist the driver to pick up