Intel's recently announced IDM 2.0 strategy includes a plan to significantly expand the manufacturing network, establishing new capacity and capability to meet
Intel's recently announced IDM 2.0 strategy includes a plan to significantly expand the manufacturing network, establishing new capacity and capability to meet
Date Posted:2024-04-09Country:Malaysia**Location**:Otis Elevator Company (M) Sdn Bhd, No. 2-1-50, Tingkat Mahsuri, 11950 Bayan Baru, Pulau Pinang.About OtisAt
Install software and hardware systems, including new equipment, anti-virus programs, and other tools commonly used by the Company - Strives to resolve malware
Intel's recently announced IDM 2.0 strategy includes a plan to significantly expand the manufacturing network, establishing new capacity and capability to meet
Intel's recently announced IDM 2.0 strategy includes a plan to significantly expand the manufacturing network, establishing new capacity and capability to meet
1.Responsible for the installation, commissioning, technical transformation, repair and maintenance of high and low voltage distribution circuits and
*This vacancy open for Pellet Workshop and Conveyor Belt Project. *Pellet workshop estimated will start operate on December 2020. *Conveyor belt project
1. Responsible for the installation, repair and maintenance of high and low voltage lines, motors and electrical equipment 2. Responsible for the maintenance
1. Responsible for the unpacking, acceptance and distribution of goods in and out from the warehouse, arrange the spare parts on the shelves, and adding
Intel's recently announced IDM 2.0 strategy includes a plan to significantly expand the manufacturing network, establishing new capacity and capability to meet
2. Tasks/Responsibility â- Assemble matches and related assemblies with support from Sr. Technicians and Pro-duction Management â- 100% follow of the
1) Technicians perform electrical or mechanical troubleshooting to determine problems in non-functioning electro-mechanical equipment used in the manufacturing
Air Con Maintenance & Repair- Air Con InstallationNEW SAN YU AIR COND & ELECTRICAL SERVICEwas established in Penang on 1991 Since itsinception, it has gained a
**Job Scope**:- To assemble repair team when breakdown occurs.- To assist the engineer to identify the causes of breakdowns and to administer repair work at
**Job Description and Qualifications**Job Grade: 105-106:**Purpose**This position is to assist CE team for execution of bulk liquid, Microbulk and packaged
**Job Scope**:- To assemble repair team when breakdown occurs.- To assist the engineer to identify the causes of breakdowns and to administer repair work at
Install software and hardware systems, including new equipment, anti-virus programs, and other tools commonly used by the Company - Strives to resolve malware
1. Perform electrical panel wiring and installation 2.Assist engineer to Inspect and troubleshoot the electrical wiring system 3. Possess experience in
Date Posted:2024-02-26Country:Malaysia**Location**:Otis Elevator Company (M) Sdn Bhd, No. 2-1-50, Tingkat Mahsuri, 11950 Bayan Baru, Pulau Pinang.About OtisAt